Landslide Management for Batu Tulis – Cross Bogor – Sukabumi Station Double Lane Project at STA 5+550

Authors

  • Budi Purnomo Setiawan Trisakti University
  • Muhammad Zaki Trisakti University

DOI:

https://doi.org/10.34306/ajri.v5i2.1052

Keywords:

Landslides, Slope Stability, Budget Design, Unit Price Analysis, Plaxis 2D, Land Subsidence

Abstract

In the implementation of the St. Batu Tulis – Lintas Bogor – Sukabumi STA 5+550 project, a significant challenge arose with the occurrence of an avalanche during construction, attributing landslides to substantial land subsidence caused by the destabilization of the slope's soil or rocks. This disruption significantly impacted construction planning, particularly in terms of cost considerations. This study conducted a comprehensive comparative analysis of the stability of the original embankment slope and slopes reinforced with gabions (measuring 2m x 1m x 0.5m), sheet piles (type W-400 A-1000), and bored piles (size D600). To evaluate the stability, it was imperative to determine the safety factor (SF) and slope deformation under applied loads. The Plaxis 8.6 program was employed for the analysis, incorporating all relevant soil parameter data. Safety factor values were calculated as 1.67 for the gabion-bored pile combination slope, 1.62 for the sheet pile-reinforced slope, and 1.63 for the bored pile-reinforced slope. Estimated costs for slope strengthening were as follows: IDR 3,525,789,199.92 for sheet piles, IDR 2,180,309,258.00 for bored pile-gabion combination, and IDR 6,689,603,822.00 for bored piles alone. The budget for slope reinforcement with gabions proved more economical by IDR 1,345,479,941.92 compared to sheet piles and IDR 4,509,294,564.00 compared to bored piles. The reinforcement type selection was based on a cost analysis, prioritizing lower expenses while ensuring construction feasibility. Gabions offer advantages such as economical prices, flexibility, and simple construction methods, but they have drawbacks, including susceptibility of galvanized coated wire to water conditions with high salt or acid content and requiring a wide area for construction due to their large size. Sheet pile reinforcement is resistant to corrosion, durable, and has good performance, but it is unsuitable for supporting very high soil due to the requirement of a large cross-sectional area and not suitable for use in rocky soils due to piling difficulties.

Downloads

Download data is not yet available.

References

B. P. D. M. R. Anwar and A. Zacoeb, “Evaluation of Importance and Implementation of Work Quality in Building Construction”.

S. Pranata, K. Hadi, M. H. R. Chakim, Y. Shino, and I. N. Hikam, “Business Relationship in Business Process Management and Management with the Literature Review Method,” ADI J. Recent Innov., vol. 5, no. 1Sp, pp. 45–53, 2023.

L. Ceferino, N. Lin, and D. Xi, “Bayesian updating of solar panel fragility curves and implications of higher panel strength for solar generation resilience,” Reliab. Eng. Syst. Saf., vol. 229, p. 108896, 2023.

J. Han and K. Akins, “Use of geogrid-reinforced and pile-supported earth structures,” in Deep Foundations 2002: An International Perspective on Theory, Design, Construction, and Performance, 2002, pp. 668–679.

M. R. D. Pratama and M. R. A. Simanjuntak, “The study of the identification of using the supply chain to increasing financing efficiency of management project for building construction x in Jakarta,” in IOP Conference Series: Materials Science and Engineering, 2020, vol. 852, no. 1, p. 12018.

H. Ahmad, M. H. Hoseini, A. Mahboubi, A. Noorzad, and M. Zamanian, “Effect of sheet pile wall on the load-settlement behaviour of square footing nearby excavation,” Geomech. Geoengin., vol. 18, no. 2, pp. 149–167, 2023.

F. Kalbuadi and B. E. Yuwono, “STUDY OF WORK UNIT PRICE PERMEN PUPR NUMBER 28 OF 2016 WITH PERMEN PUPR NUMBER 1 YEAR 2022 IN JU 1 RIVER EXCAVATION WORK,” ADI J. Recent Innov., vol. 5, no. 1, pp. 93–99, 2023.

E. J. Mihardja, S. Alisjahbana, P. M. Agustini, D. A. P. Sari, and T. S. Pardede, “Forest wellness tourism destination branding for supporting disaster mitigation: A case of Batur UNESCO Global Geopark, Bali,” Int. J. Geoheritage Park., vol. 11, no. 1, pp. 169–181, 2023.

I. P. Hastuty and A. M. Suwandi, “Slope stability analysis using sheet pile reinforcement with the Bishop method,” in IOP Conference Series: Materials Science and Engineering, 2020, vol. 851, no. 1, p. 12022.

M. Mamun, R. Othman, and Z. Zulkifli, “Knowledge Management: Determine the Influencing Factors for Practicing at the Libraries in Bangladesh,” J. Educ. Cult. Soc., vol. 14, no. 1, pp. 672–696, 2023.

A. Akbar, A. Rehman, I. Ullah, M. Zeeshan, and F. E. A. Afridi, “Unraveling the dynamic nexus between trade liberalization, energy consumption, CO2 emissions, and health expenditure in Southeast Asian countries,” Risk Manag. Healthc. Policy, vol. 13, pp. 1915–1927, 2020, doi: 10.2147/RMHP.S272801.

D. Permatasari, G. Maski, Susilo, and A. Manzilati, “Implementation of Poverty Reduction in North Maluku Province,” in Modeling Economic Growth in Contemporary Indonesia, Emerald Publishing Limited, 2022, pp. 123–133.

S. Wahyuni, A. A. Taufik, and F. K. P. Hui, “Exploring key variables of port competitiveness: evidence from Indonesian ports,” Compet. Rev. An Int. Bus. J., vol. 30, no. 5, pp. 529–553, 2020.

D. Jonas, E. Maria, I. R. Widiasari, U. Rahardja, and T. Wellem, “Design of a TAM Framework with Emotional Variables in the Acceptance of Health-based IoT in Indonesia,” ADI J. Recent Innov., vol. 5, no. 2, pp. 146–154, 2024.

M. Ghozali, “Disaster Resilient Village Based on Sociocultural Aspect in Ponorogo,” Mimb. J. Sos. dan Pembang., vol. 36, no. 1, pp. 63–73, 2020.

S. T. Dewi, “Perencanaan Penjadwalan Pekerjaan Struktur Menggunakan Kombinasi Metode PERT Dan PDM (Studi Kasus: Proyek Pembangunan Gedung DLC UGM),” 2020.

M. H. R. Chakim, M. Hatta, A. Himki, A. R. A. Zahra, and N. N. Azizah, “The Relationship Between Smart Cities and Smart Tourism: Using a Systematic Review,” ADI J. Recent Innov., vol. 5, no. 1Sp, pp. 33–44, 2023.

E. A. Beldiq, B. Callula, N. A. Yusuf, and A. R. A. Zahra, “Unlocking Organizational Potential: Assessing the Impact of Technology through SmartPLS in Advancing Management Excellence,” APTISI Trans. Manag., vol. 8, no. 1, pp. 40–48, 2024.

B. Bhima, A. R. A. Zahra, T. Nurtino, and M. Z. Firli, “Enhancing Organizational Efficiency through the Integration of Artificial Intelligence in Management Information Systems,” APTISI Trans. Manag., vol. 7, no. 3, pp. 282–289, 2023.

A. Hamidi and K. Abbeche, “Numerical analysis of bearing capacity of strip footing built on geogrid-reinforced sand slope over soft clay layer (revised version 3),” Arab. J. Sci. Eng., vol. 45, no. 10, pp. 8269–8279, 2020.

M. C. Saputra and E. Andajani, “Analysis of Factors Influencing Intention to Adopt Battery Electric Vehicle in Indonesia,” ADI J. Recent Innov., vol. 5, no. 2, pp. 100–109, 2024.

Y. Sun, S. Cao, H. Xu, and X. Zhou, “Application of distributed fiber optic sensing technique to monitor stability of a geogrid-reinforced model slope,” Int. J. Geosynth. Gr. Eng., vol. 6, pp. 1–11, 2020.

N. N. Rafiana, “Technopreneurship Strategy to Grow Entrepreneurship Career Options for Students in Higher Education,” ADI J. Recent Innov., vol. 5, no. 2, pp. 110–126, 2024.

M. M. Hajitaheriha, D. Akbarimehr, A. Hasani Motlagh, and H. Damerchilou, “Bearing capacity improvement of shallow foundations using a trench filled with granular materials and reinforced with geogrids,” Arab. J. Geosci., vol. 14, pp. 1–14, 2021.

W. Sejati and T. T. Akbar, “Optimization Study of Cropping Pattern in the Klakah Irrigation Area, Lumajang Regency, Using Linear Programming,” ADI J. Recent Innov., vol. 5, no. 2, pp. 136–145, 2024.

F. Luo, R. Huang, and G. Zhang, “Centrifuge modeling of the geogrid-reinforced slope subjected to differential settlement,” Acta Geotech., vol. 15, pp. 3027–3040, 2020.

D. Jonas, N. A. Yusuf, and A. R. A. Zahra, “Enhancing Security Frameworks with Artificial Intelligence in Cybersecurity,” Int. Trans. Educ. Technol., vol. 2, no. 1, pp. 83–91, 2023.

Downloads

Published

2024-02-05

How to Cite

Setiawan, B. P., & Zaki, M. (2024). Landslide Management for Batu Tulis – Cross Bogor – Sukabumi Station Double Lane Project at STA 5+550. ADI Journal on Recent Innovation, 5(2), 168–180. https://doi.org/10.34306/ajri.v5i2.1052